Musco Lighting logo News & Events
Musco Lighting logo
Company Overview
Permanent Lighting
Temporary Lighting
Project Showcase
News & Events
Contact Us
Request Information
Careers

 
Musco Lights
FIFA World Cup Training Pitches


  Michaelhouse School FIFA training pitch
Michaelhouse School
Musco Lighting recently installed floodlighting for 10 World Cup training base camps in South Africa. In just 57 days, Musco manufactured, shipped, and installed the floodlighting systems for the pitches, including over 450 fixtures in total. Twelve ocean cargo containers were needed to transport the floodlighting equipment to South Africa.

For each project, Musco’s team of professionals works to meet unique needs by providing turn-key results including project management solutions, electrical design and installation, and onsite resources. For the World Cup training pitches, the geographically varied locations required establishing several different jobsites and presented a range of soil conditions for installation. At the Northlands, beach sand required the foundations to be dug by hand. At Laudium, the team encountered solid rock. Access to each site was also challenging, since turf contracts were awarded ahead of floodlighting, and the team had to work around the newly built grass playing pitches.

Field Team
Randburg High School Brazil
Bekker High School

Portugal

Laudium Stadium Germany
Ingwenyama Lodge Chile
Northwood High School Greece
Pezula Field of Dreams France
Northlands School Cameroon
Ashton College Nigeria
Hyde Park High School Slovenia
Michaelhouse School Paraguay


Several pitches had old floodlights that needed to be taken down before the new floodlights could be installed. Two pitches have temporary installations that will be removed after the World Cup. Four pitches require three of the columns to be moved after the World Cup. Musco was able to install suitable temporary floodlighting and will move columns post-tournament without difficulty.

World class athletes will practice at these pitches in preparation for the 2010 FIFA World Cup, which will take place 11 June – 11 July of this year.

Musco's energy-efficient Green Generation Lighting® systems are the result of 30 years of technology innovation. Green Generation lighting offers up to 50% savings in operating costs through reduced energy consumption. Maintenance costs are eliminated for 10 years, including lamp replacements. Off-site spill and glare is cut in half, protecting the environment.
Contact Us




+44 (0)1942 811 777
+353 (0)61 375 620
e-mail: eurosales@musco.com


Musco Home Page
Company Overview | Permanent Lighting | Temporary Lighting
News & Events | Contact Us | Request Information | Careers
Site Map


© 2007 - 2010 Musco Sports Lighting, LLC. All rights reserved.